Where in the Regs does it say we need to do it? Does it always have to be connected within 600 mm of the Meter Inlet? How do we know if something is an extraneous conductive part or not, are there tests? Can I just use 10 mm2 conductor for bonding?
Are some of the topics covered.
0 Comments